SALTASH, CORNWALL
Public Consultation
Welcome
Bloor Homes is preparing a full planning application for approximately 156 new homes on land within the wider Treledan development at Saltash.
The proposals relate to areas of vacant “white land” located within the approved Treledan masterplan area. These sites sit at the heart of the wider development and were always identified as land capable of accommodating future development as part of the urban extension.
We are sharing our emerging proposals with the local community before submitting a planning application to Cornwall Council.
Our Proposals Include:
- Approximately 156 new homes
- Affordable housing
- New landscaping and biodiversity enhancements
- Public open space and tree planting
- Connections into the approved Treledan infrastructure
- Support for wider community facilities, including sports pitches
Have Your Say
Your feedback is important and will help shape the proposals before they are finalised.
Bloor Homes is a family-owned housebuilder with a proud legacy across the South West. We’re known for thoughtfully designed homes and carefully planned communities that stand the test of time.
Why is this development needed?
Helping to Meet Cornwall’s Housing Needs
Cornwall Council currently cannot demonstrate a five-year housing land supply. This creates an urgent need to deliver new homes in sustainable and appropriate locations across the county.
Saltash has already been identified as a key location for growth due to its:
- Existing services and facilities
- Public transport links
- Employment opportunities
Why These Sites?
The proposals represent a logical and sustainable opportunity to help meet housing need because:
- The land sits within the approved Treledan masterplan area.
- Surrounding infrastructure has already been planned and approved.
- The sites connect directly into approved roads, walking and cycling routes.
- The wider development already includes schools, open space, community facilities and transport improvements.
Importantly, the proposed homes are located within the centre of the approved development and are not expected to directly affect existing residential areas.
The story of Treledan
Building on an Approved Masterplan

Treledan is a major urban extension that already benefits from planning permission for:

Existing Approvals
Reserved matters approvals are already in place for:
- Phase 1 – 387 homes
- Phase 2A – 326 homes
- Phase 3 – 287 homes
A New Planning Application
The original Treledan consent is now fully accounted for. As a result, a new planning application is required for the additional homes proposed within the white land parcels.
Sustainability
Building for the Future at Treledan
We are committed to delivering high-quality, sustainable homes that are fit for the future.
Fabric First Design
Our homes will benefit from:
- Enhanced insulation
- Advanced insulated wall systems
- High-performance double glazing
- Sustainably sourced timber
Renewable Technologies
Proposals include:
- Air Source Heat Pumps where viable
- Solar photovoltaic panels
- Wastewater heat recovery systems
- Intelligent heating controls
- Energy-efficient lighting and appliances
- Electric vehicle charging points
These measures help reduce energy use, lower carbon emissions and improve affordability for residents.
What are we proposing?
New Homes Within the Approved Treledan Masterplan
We are proposing approximately 156 new homes across White Land Parcels 2 and 3.
The development will provide a mix of one, two, three and four-bedroom homes, including affordable housing.
White Land Parcel 1 (WLP1)
WLP1 will become an Ecological Enhancement Area providing:
- Additional boundary screening
- New habitat creation
- Biodiversity Net Gain improvements
White Land Parcel 2 (WLP2)
Approximately 47 homes.
Located within the approved Phase 2 area, WLP2 connects naturally to Treledan Way, the approved care home site and the wider movement network.
White Land Parcel 3 (WLP3)
Approximately 109 homes.
Located within Phase 3, WLP3 has been designed around existing landscape features and incorporates open space while maintaining strong walking and cycling connections.
Affordable Housing
The proposals will provide affordable homes alongside private housing to help meet a range of local housing needs.
Community Benefits
Investment in Saltash
The wider Treledan development is delivering:
Sports Pitches Update
Plans for the approved sports pitches are progressing positively.
Bloor Homes continues to work closely with Cornwall Council and stakeholders to finalise the detailed design, with a planning application expected in the coming months.
Delivering Infrastructure Alongside Homes
The proposed homes will support:
- Wider infrastructure delivery
- Community facilities investment
- Active travel improvements
- Sustainable growth in Saltash
Landscape and Biodiversity
A Landscape-Led Approach
The proposals have been developed to respond carefully to the site’s landscape and environmental setting.
Key features include:
- New tree planting
- Existing hedgerow retention
- Biodiversity enhancements
- Additional planting within WLP1
- Habitat creation
- Sustainable drainage features
The proposals will deliver at least 10% Biodiversity Net Gain in accordance with national policy requirements.
Sustainable and well connected
A Sustainable Location for New Homes
Treledan was identified as a suitable location for future growth due to its excellent connectivity.
The site benefits from:
- Approved road infrastructure
- Nearby bus services
- Walking and cycling routes
- Future A38 pedestrian and cycle bridge connections
- Proximity to employment areas and local services
Reducing Impacts on Existing Communities
The proposals:
- Sit within an approved strategic allocation
- Are enclosed by approved development areas
- Utilise existing planned infrastructure
- Avoid direct impacts on existing residential communities
Next steps
What Happens Next?
We are currently at an early stage in preparing the proposals.
Before submitting a planning application we are:
- Undertaking technical assessments
- Engaging with Cornwall Council
- Consulting local stakeholders
- Seeking feedback from the community
A planning application is expected to be submitted following completion of the consultation and assessment process.
We Want to Hear From You
Your feedback will help inform the final proposals before submission to Cornwall Council.
Please complete the feedback form to share your views.
Feedback
Thank you for taking the time to attend our consultation for proposals at Treledan, Saltash.
We are interested to hear what you think of the proposals and would appreciate a few moments of your time to complete this questionnaire. The online feedback form will close on the 8th of July, 2026










